Price from the cost database
Audience: Subcontractors · 4 min
Steps
- Open the matching calculator on buildx.pro/costs with the job region set.
- Read the low/high range for your tier.
- Apply your production rate: crew cost per day divided by units per day.
- If your number lands outside the range, know why before submitting (access, difficulty, schedule compression).
- Submit itemized against the GC scope lines with exclusions stated.