Skip to main content

Getting quotes

Audience: Property owners · 5 min

Prerequisites​

  • Your calculator breakdown with tier and region set

Steps​

  1. Shortlist three contractors from the profiles suggested with your estimate.
  2. Send all three the identical scope plus your product selections.
  3. Set a single bid deadline and a site-visit window.
  4. Level the bids: same lines, allowances flagged, exclusions listed.
  5. Check license, insurance, and two recent references before signing.

Red flags​

  • A total with no line items
  • Allowances over 30 percent of the total
  • Pressure to sign before selections are made
  • No change-order process in writing