# Calculator accuracy

> What a buildx.pro cost range means, what it leaves out, when to trust it or question it, and how to report a number you think is wrong.

Source: https://docs.buildx.pro/docs/calculators/accuracy/

buildx.pro calculators give a planning range, not a quote. Each calculator page says so: estimates are approximate and vary by location, project scope, and current market conditions, and you should contact a local contractor for an accurate quote. This page explains what the range can and can't tell you.

![Calculator estimate showing a low and high range with location factors](https://docs.buildx.pro/_astro/calculator-breakdown.DKWF8YLI_GAYMn.webp)

## What the range means

- The **low** end adds up the low price of every line; the **high** end adds up the high prices. See [How cost calculators work](https://docs.buildx.pro/docs/calculators/how-they-work.md).
- The quality level and your ZIP area scale both ends of the range.
- The range describes a typical job of that type at that size. It's not a promise that a real bid will fall inside it.

## What the calculator can't see

- **Your site.** Hidden damage, rot, old wiring, structural problems, and tight access all raise real prices.
- **Permits and inspection fees.** There is no permit line.
- **Allowances.** There is no line for items you haven't picked yet.
- **Disposal detail.** Disposal is folded into the Equipment & Disposal line, not priced on its own.
- **Local demand.** Regional factors come from wage and price data, not from this month's backlog. After a storm or in a busy season, bids can run high.
- **Your contractor's overhead and profit.** These vary a lot between companies.

Read **What's NOT Included** and **Assumptions** on the page for the scope each calculator assumes.

## When to trust it, when to question it

Use the range with confidence for:

- Setting a first budget
- Comparing quality levels or places
- Spotting a bid that's far off and asking why

Lean on it less, and get itemized bids, when:

- The building is old or the job opens walls, floors, or roofs
- You're adding on, moving structure, or changing the layout
- Your finishes fall between two quality levels
- Your area is in a demand surge

In those cases, ask each contractor which part of their price differs from the breakdown, and why.

## Report a wrong number

If a calculator looks wrong (a unit price that can't be right, a range far from every bid you got, or the wrong unit), tell us:

1. Copy the calculator link. It includes your quantity, ZIP, and quality level.
2. Note what you expected and why: for example, three local bids and their totals.
3. File a ticket at [File a support ticket](https://docs.buildx.pro/docs/help/file-a-ticket.md). Include the link, your ZIP, and what you saw.

Contractors signed in to MyBuildX can also file it from **Help** at [mybuildx.com/help](https://mybuildx.com/help).

## Related

- [How cost calculators work](https://docs.buildx.pro/docs/calculators/how-they-work.md)
- [Regional pricing reference](https://docs.buildx.pro/docs/calculators/regional-pricing-reference.md)
- [Understanding estimates](https://docs.buildx.pro/docs/owners/understanding-estimates.md)
